0019: Approved prototype study and delegated evaluation design¶
Date: 2026-10-20. Status: owner-approved scope; agent-specified design. Scope: W13 / #14. Supersedes the missing-authority state in decision 0018, not its binding semantics.
The owner approved the English, single-turn, prompt-only inj.direct/1 study,
acting as prototype decision owner, with FPR at most 1%, TPR at least 90% and
integer conversion quality loss at most two percentage points. The owner
delegated evaluation design and selection of licence-reviewed public datasets,
models and software. This is a normalized decision record, not a transcript,
signature, independent review or adoption of a production safety policy.
The approved local envelope is four CPU threads, 16 GiB memory, 20 GiB working storage, two hours per job, six hours total and zero monetary spend. The owner also authorized use of their HF credential/API for GPU Jobs when necessary and preferred execution on the Mac. AUTHORITY records these permissions. The one-job/one-hour/$2 HF envelope is a conservative agent execution limit under that permission, not a spending figure supplied by the owner. No job, account top-up, scheduler or confidential-data upload follows from this record. The credential remains outside version control.
The agent fixes the evaluation design before selecting data or measuring candidates. Its alpha, power assumptions, joint decision, calibration allocation, paired loss test, retention and resource criteria are delegated design choices. They are not measured results or separate owner endorsements. No historical result is reused. Any later design correction needs a new identity and decision before new measurement.
Approval permits reviewing sources and importing eligible public assets without
another generic approval request. It does not clear the three existing source
holds. Each selected revision still needs a concrete licence/provenance record;
ambiguous rights, gated terms and private inputs are excluded. After import, pin
actual file/split/candidate/evaluator identities before confirmatory measurement.
The incomplete proposal must continue to reject as an AdmissionProtocol.
Engineering work on import, runtimes and proof adapters can proceed on fixtures.
The owner requested options for genuine hardware and an independent reviewer. The options do not authorize buying another cloud host, contacting a reviewer or claiming independence. Hardware evidence and external verification remain separate gates.